�?Having said that, once the pressure stabilization time is 6 min, the fitting diploma is the bottom and the analysis results of the drilling fluid lost control performance is “common.�?In a specific vary, the coincidence degree of your indoor and area drilling fluid lost control efficiency is negatively correlated With all the force sta